News detail

DUNKERQUE-PORT:REPAIR OF DARSE 6 BRIDGE
11th march 2015

DUNKERQUE-PORT: REPAIR OF DARSE 6 BRIDGE

Work to repair the Darse 6 Bridge began this Monday, 9 March, and is expected to last two months.

During the works, traffic on Chaussée des Darses will be restricted at the Darse 6 bridge.

The original two-lane dual carriageway is now a two-lane single carriageway, with a speed limit of 30 km per hour.

The work will take place in two phases to allow traffic at all times.

Drivers must therefore exercise great care and observe the speed limits when passing the works area.